THE ISSUE IS THE SEWER PLAN SELECTED IN 2001 FAILED. WE DID NOT MEET THE REQUIRED CRITERIA OF A 100 YEAR STORM.
I WOULD LIKE TO THANK THE TWO ENGINEERS WHO RESIGNED FROM THE SEWER BOARD FOR THEIR HARD WORK IN TRYING TO SELECT THE CORRECT PLAN, AND LISTENING TO THE PUBLIC.
ONE OF THREE PLANS WAS SELECTED BY THE SEWER BOARD AND PUBLIC.
THERE WAS A CLOSED DOOR MEETING LATER AND THE PLAN SELECTED WAS CHANGED, BY ONE VOTE. THE PERSON ON THE SEWER BOARD WHO CHANGED THEIR VOTE WAS CHAS HUNTER. THIS IS THE POINT IN TIME WHEN OUR TWO ENGINEERS RESIGNED. FORMER MAYOR HUNTER WAS ASKED IN THE HALLWAY WHY HE CHANGED HIS VOTE. HE REPORTED HE NEEDED THE JOB.
WE WILL NOW WAIT AND SEE THE INFORMATION THE CITY (EMC) REPORTS TO IDEM AND THE EPA ABOUT OUR LAST STORM.
THIS BLOG HAS NO IDEA AS TO WHAT HAPPENED TO THE LAST ARTICLE WROTE, ALONG WITH THE DETAILS OR COMMENTS. BLOGGER CRASHED AND THE ARTICLE AND COMMENTS WERE LOST.
THANK YOU AGAIN BILL UTZ AND BOB LEDFORD!
Showing posts with label THE 2001 SEWER PLAN FAILED. Show all posts
Showing posts with label THE 2001 SEWER PLAN FAILED. Show all posts
Friday, May 13, 2011
Subscribe to:
Posts (Atom)